Catch the Sunshine!

  • Greenhouse CompanyP.O. Box 1564 Mobile, AL 36633 USA
  • phone251-471-5238
  • fax251-471-5465 (fax)
  • phone1-800-531-4769

Electric Soil Sterilizers

Steam Generators

SG12 STEAM GENERATOR

  • 400 lbs. steam per hour
  • 2.0 – 2.25 gallon #2 fuel per hour
  • 45 PSI - Ultra dry steam
  • Fuel pressure gauge
  • 8" chimney adapter
  • 120 V power supply
  • 20 gallon fuel tank
  • 180 ft. heating coil
  • Internal steam separator
  • Steam trap
  • 12' electrical cord
  • Treats up to 2 cu. yards of soil in approx 2 hours

SG15 STEAM GENERATOR

  • 500 lbs. steam per hour
  • 2.50 gallon #2 fuel per hour
  • 60 PSI - Ultra dry steam
  • Fuel pressure gauge
  • 8" chimney adapter
  • 120 V power supply
  • 42 gallon fuel tank
  • 220 ft. heating coil
  • Internal steam separator
  • Steam trap
  • 12' electrical cord
  • Treats up to 2 cu. yards of soil in approx 1 1/2 hours

SG15 STEAM GENERATOR SPECIFICATIONS:

  • Fuel is No. 2 diesel
  • Vented 8” chimney connection
  • 120 volt electrical power supply at 20 amps
  • Four minute steam at 45 lbs. (55° water to 300° steam temperature)
  • 42 gallon fuel tank, 2 ¼ - 2 ½ gallon per hour usage
  • Highly mobile with pull tongue and auto type steering
  • All fittings and hose required for steam delivery are furnished
  • Water supply – 45 PSI, ¾” hose and 3 GPM minimum
  • “Clearwave” water conditioning for reduced lime build up
  • Gauges for all adjustable controls and steam temperature monitoring
  • Start up water diverter (manual) in the system
  • One year warranty on all parts (freezing of unit excluded)

STEAM CABINET FEATURES:

  • 14 gauge polished stainless steel
  • Gasket sealed, fully latching doors.
  • Available in 84” and 110” models

Double Steam Cabinet Operation:

  • Load cabinet 1
  • Move 3-way valve to send steam to cabinet 1
  • Load/unload cabinet 2
  • When cabinet 1 is complete, move 3-way valve to send steam to cabinet 2
  • Unload/load cabinet 1
  • When cabinet 2 is complete, move 3-way valve to send steam to cabinet 1
  • Repeat cycle as required.

Back